The slope of the slipway is 1:8; overall launching with a lateral shifting frame is adopted; the frame is divided into 2 segments; the main frame is 110m; the auxiliary frame is 80m. When the main frame is launched, the launching weight is 6000t; when the main frame and the auxiliary frame are launched in a interlinking manner, the launching weight is 10000t.