The steel box girder fabrication and installation works of the Wu Xian Highway reconstruction project begins from Wuchang Zhalankou Flyover Phase 2, and ends at Qingling Flyover. The trunk bridge is 7,200 meters long; the whole line adopts flyover and ground auxiliary road; there are total 363 segments for lifting, which total over 20,000 tons.