The Fuyuan Road Xiang River Bridge Project in Changsha comprises the main bridge, the approach bridge on the bank and the link road. The superstructure of the main bridge is a basket handle steel arch & composite girder, tied-arch bridge; the main girder is continuous; 3-span arch ribs are supported on V piers; the arch rib system adopts steel structure; the main arch span is 188 metres.